European diagonal
The ' European Diagonal ' , whose main nodes are Lisbon , Madrid , Barcelona , Marseille and Milan , is an investigation into a new territorial and economic hub located in an area of great dynamism within Europe. It is a reflection on a European territorial context that is undergoing major changes. Faced with the 'classic ' European territory, descriptions currently being defined new relationships between the most dynamic urban regions of southern Europe .
Create an area of "global integration "
The activity of the south wants to join the so-called ' European pentagon ' , London, Paris , Hamburg , Milan and Munich , to create an area of global integration , because we must not forget that 20 % of the territory of the continent produces 50 % of GDP. The ' Diagonal ' includes not only the cities , but the entire area , which includes Valencia, Zaragoza , Bilbao ...
This ' Diagonal ' is composes through strategic transport infrastructure , telecommunications , economic and environmental factors to improve the competitiveness of the territory , making it possible to extend these communications and outside of Europe because of the great relationships of the countries and cities other regions of the world.
Madrid, economic node, transport and innovation
The project assigned to Madrid a role in economic, financial node, innovation and transportation . Given its geographical location and infrastructure available , such as Barajas airport lines or high-speed train , the city may be the link between Europe and other continents.
WorldWideWorkWeb
The program networking Work World Wide Web (4W) is intended the interrelation of researchers, developers and entrepreneurs which will enjoy the facilities provided by the program 4W in any centros.La mobility of entrepreneurs between the centers 4W is one of its strengths, as it is vital knowledge exchange. For better communication between businesses and potential fellows a website where companies present their requirements to candidates and offers canditados used their skills and improves a possible link-user company
First steps
The project location near the old factory building Tabacalera offers the possibility of a reorganization of adjacent areas, starting with the traffic, the demolition of old buildings for deterioration associated with the factory and the wall that delimited in its south facade. All this creates a public space to the Glorieta Ambassadors, which seeks the embedding in the building by the middle third, achieving this public space living with the current program of the Social Self-managed center creating a common space of relation between programs.
The project location near the old factory building Tabacalera offers the possibility of a reorganization of adjacent areas, starting with the traffic, the demolition of old buildings for deterioration associated with the factory and the wall that delimited in its south facade. All this creates a public space to the Glorieta Ambassadors, which seeks the embedding in the building by the middle third, achieving this public space living with the current program of the Social Self-managed center creating a common space of relation between programs.
Current occupation Tabacalera building self-managed by the Social Centre is located in the southern half, covering the largest patio and south, plus external warehouses and south exterior patio. This so scattered occupation is conditioned by the stage of current deterioration of the building and the division between this center and the Ministry of Culture, the latter occupying part of the northern half.
The way to occupy the middle third of Tabacalera building starts with a deletion of existing slabs that support the 3 plants, thus achieving a high open space in the 4 transepts. To make the connection between public space and Tabacalera opening is made in the south wall that serves princial program access. The difference in elevation between the Glorieta Street Ambassadors and Provisions is saved with a ramp-access between the square and the remaining space 4W.
The incursion of 4W project proposes a new reorganization of spaces you used tobacco. The building is divided into 3 sections, one for the program and two 4W for the CSA, along with this attached to the ship would also be part of CSA. This new organization instead of separating half Tabacalera activities which power is a cultural exchange between actions and activities undertaken by both the new program as the social center, creating in the middle third of a street knowledge and exchange between the parties
The removal of existing slabs Tabacalera gives a comprehensive and high interior space. As seen, the difference in elevation between the south and north sides of the building helps create a ramp that will serve both access to the promenade and 4W program and an internal current amphitheater cubierto.Las trusses are replaced by a new covering consisting shaped metal beams, following the geometry of the actual housing with curved walls adapted to different linear continuity for all the following complete alignment proyecto.Para interior space different eggs hatch in the existing walls where modules peek out, so they created an interior-exterior continuity, remaining outwardly from the housing and into the workshop-office, creating a set of workspaces
The interiors are characterized by the synergy between the new and the old, punctuated by the simplicity of the materials, based on the manufactures brick walls, metal structure and polycarbonate finishes. Gateways have a dual function, serving for connection between modules, creating spaces of step height from which the action is seen on the ground floor, and a structure function, since I braced horizontal forces of the modules as they are connected if creating a stable set block.
The projected solar wall has a dual role as it serves as an architectural element of concealment of an urban waste generated after the electric urban operations and as input for building use. In this wall has solar panels that have some small motors that turn the solar cells according to the solar rotation. This will fail more and better hours and Madrid sun generates as changing the configuration of the wall referred image. For the construction of solar wall panels will be coupled to a substructure that supported these panels registrable and in case of failure or a problem they can be replaced.
The game geometry is achieved by a single panel and at various positions around the wall, creating an image of moving digits.